Showing posts with label Context. Show all posts
Showing posts with label Context. Show all posts

Wednesday, 4 May 2011

Distribution Test


I am still aiming to keep the idea of setting up a direct relationship with the existing buildings and wider context.




Monday, 31 January 2011

Brick Breaker Strategy


The angle of the extension frames is the same angle with the existing flying buttresses. Directions are coming from two origin points: transept and the choir center, extending - corresponding the end of the structural grid of the Beauvais Cathedral.


The extension is like the ball bouncing between the brick breaker block and the bricks, the in-between space is to be discovered between the cathedral and the neighbors. Entrances, walkways, vegetation is to be mapped that overlap with the proposal's site.


In-between space in plan


In-between space shown on the aerial photograph (click on the photograph for the larger image)

Thursday, 27 January 2011

Boundary Studies


The descending mass - starting from the nave. 



The existing structural grid of the Beauvais Cathedral (bolder lines) meeting the repetition of choir (13 degrees, rotation)


The Context vs Wrapper exploration re-make according to single centered version.

Wednesday, 26 January 2011

Scale Potentials


Using the center point for the transept and the origin for the choir, new set of flying buttresses are formed around the cathedral. The study shows the maximum length (in plan) of the flying buttresses until they reach to a building on site. 

The longest reaching points are more valuable as entrances - vistas towards the building, from top to the bottom, 3 sections are more to be "built" parts while the open space in front of the south facade can ideally be used as ground level.
Taking the center of the transept as the origin with 60m diameter for the extension of the cathedral is making more sense in terms of the available space around the cathedral.

Tuesday, 25 January 2011

Understanding the Limits


01, 02, 03 Culture Bishop's House Museum
04 Health - Orthopedist - Florin Patrick
05 Employement Agency - Emploi 60
06 Residential
07 GovernmentFamily Allowance
08, 09 Residential  
10, 11, 12, 13, 14 Culture - National Gallery of Tapestry
15 Employement Agency - Alary Travail Temporarie
16 Retail - Des Fleurs en Plus
17 Restaurant - Le Zinc Bleu
18 Retail - Anquetil Optique
19 Restaurant - Les Palais Bleu
20 Residential

distance from the origin - in between space from the cathedral
01 77 625mm - 57 259mm
02 79 970mm - 60 115mm
03 154 933mm - 134 567mm
04 53 920mm - 32 247mm
05 64 067mm - 26 697mm
06 62 578mm - 31 109mm
07 119 314mm - 87 145mm
08 35 334mm - 10 259mm
09 149 013mm - 128 270mm
10 46 597mm - 25 254mm
11 67 615mm - 46 872mm
12 74 073mm - 53 479mm
13 71 274mm - 50 530mm
14 61 445mm - 40 702mm
15 140 865mm - 120 121mm
16 82 702mm - 57 627mm
17 77 353mm - 45 185mm
18 72 661mm - 41 241mm
19 67 210mm - 29 839mm
20 129 502mm - 107 469mm